wip(L27, side branch): passages cross open voids inside shared natural rock columns
Unsupported passage runs > 12.5 m become a solid relief-bearing column (ceiling/island to ground, flared base) with the helix inside, for every recipe; FI anchor uses the same path. All 4 styles x both recipes: 0/0/0, 0 open-air, naturalness pass; no-long-bridge audit (L26 fails it). Deterministic, Clang = GCC. Look approved; cost +35% SW / +19% FI blocks merge (L28). Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com> Claude-Session: https://claude.ai/code/session_01CSFYgsdW8ejZSyiMf4qRSX
This commit is contained in:
1 parent
37a223046c
commit
07b3fe2852
14 files changed
+772
-201
No files matched your search
Binary file not shown.
|
After Width: | Height: | Size: 21 KiB |
Reference in new issue
Block a user