core: one tunnel for two strates with landing chambers (L151, owner design; v238, grade open)
Each passage records upper and lower landing chambers (floor, gradient, radius, 4.5 m clear height) composed with the tunnel shell; cave route endpoints bind to the chambers; envelope audit permits only the named chamber joints. Seed 2: 0 solid in 319,579 passage+chamber capsule samples, 0 shell violations, 0 envelope conflicts, controls fire. Open: tunnel-to-chamber floor blend leaves 19.1/19.0 deg grades (limit 15); sweeps/timing not run. Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com> Claude-Session: https://claude.ai/code/session_016dhxM43dnWvUu2B5Ph1iG1
This commit is contained in:
1 parent
9ac60d5d18
commit
5bd158d4eb
21 files changed
+1949
-105
No files matched your search
BIN
Binary file not shown.
|
After Width: | Height: | Size: 20 KiB |
Reference in new issue
Block a user