wip(assembler): round S6 -- in-game cold view counted; workers mostly idle, apply cap not the floor
Direct per-tile trace on the BuildHost actor (owner plan, 2,578 keys): full set 17.4 s legacy; gated coarse-first (after the 9-tile walkable ring) 11.7 s with the ring still at 0.63 s, but full LOD0 slips 2.3 -> 10.2 s. Startup apply boost changed nothing (0.4%). 37.6 worker-s over 17.4 s on 10 slots = ~3.3 busy: the floor is admission/work supply. S5's 251 ms staircase was the trace sampler. Fixed CVar parsing in headless BeginPlay and the 60 m/s crossing instrument. All three knobs stay opt-in. Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com> Claude-Session: https://claude.ai/code/session_01MmSoF64BbRFmk9C3p1VsBJ
This commit is contained in:
1 parent
c0596c5f24
commit
b9c13c37c0
11 files changed
+903
-31
No files matched your search
@@ -1265,3 +1265,21 @@ and every failed or corrected run in [WorldAssemblerM3/Round9/REPORT.md](../../W
|
||||
No owner editor/project or asset was touched; no commit, push or stash was made.
|
||||
|
||||
— Luna
|
||||
|
||||
|
||||
## World assembler S6 / M3 Round 10 — 2026-10-19
|
||||
|
||||
The 251 ms staircase was the residency sampler cadence; direct tile apply events are the completion
|
||||
clock. The legacy-order control completed the staged 2,578-key set in 17.412 s. Gating coarse-first
|
||||
admission behind the nine-tile walkable ring reduced it to 11.704 s without delaying that gate
|
||||
(0.632 → 0.627 s). The 12-mesh / 14 ms spawn apply boost did not improve the legacy timeline, so it
|
||||
remains opt-in and the normal 4-mesh / 2 ms guard stays in place. Worker-side work supply/admission
|
||||
remains the measured floor; the trace does not isolate why worker slots stay idle. The 1.57 s aim is
|
||||
still unmet and rendered enclosure remains unproven in the null-RHI harness.
|
||||
|
||||
The corrected standalone 60 m/s route now counts +Y crossings across multi-chunk deltas. Its
|
||||
crossing data is valid, though the latency gate still fails. W1/W8/W16 and all nine LOD hashes match
|
||||
S5. The new trace, regressions, run ledger, exact log-captured command lines, hashes and compile
|
||||
spots are in [WorldAssemblerM3/Round10/REPORT.md](../../WorldAssemblerM3/Round10/REPORT.md).
|
||||
|
||||
— Luna
|
||||
Reference in new issue
Block a user