fix(core): smooth tunnel entrance floor; verifier keeps baselines out of /tmp (L47); research R14

The demo tunnel's hard floor cap used a vertical Z - floorZ on a sloped Bezier floor, which is not a signed
distance, so marching cubes produced a staircase through the first 7 m (40-51 mm ripple, 82 mm steps). The
cap now uses the grade-normalised signed distance with a floor-adjacent bore re-application fading over the
entrance; mesh tile Z bounds include cavern bounds. New three-rail entrance audit: L46 fails, L47 passes.
verify: the cost baseline exports only build inputs into Saved/Linux/<out>/baseline-<commit> and removes it;
/tmp unchanged after a full tier. Demo off: owner hashes identical to L46. fast/medium/full PASS.
Known: sawtooth at the tunnel wall foot (next round). Research R14: Windows/MSVC readiness review.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_016dhxM43dnWvUu2B5Ph1iG1
This commit is contained in:
Fr0zkaandClaude Opus 5.5 committed 2026-10-24 12:54:39 +02:00
1 parent e016f6a20f
commit c091e4434f
13 files changed
+839 -27

No files matched your search

Binary file not shown.

After

Width:  |  Height:  |  Size: 36 KiB

Binary file not shown.

After

Width:  |  Height:  |  Size: 39 KiB

Binary file not shown.

After

Width:  |  Height:  |  Size: 40 KiB

Binary file not shown.

After

Width:  |  Height:  |  Size: 33 KiB

Binary file not shown.

After

Width:  |  Height:  |  Size: 58 KiB