Each passage records upper and lower landing chambers (floor, gradient, radius, 4.5 m clear height) composed with the tunnel shell; cave route endpoints bind to the chambers; envelope audit permits only the named chamber joints. Seed 2: 0 solid in 319,579 passage+chamber capsule samples, 0 shell violations, 0 envelope conflicts, controls fire. Open: tunnel-to-chamber floor blend leaves 19.1/19.0 deg grades (limit 15); sweeps/timing not run. Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com> Claude-Session: https://claude.ai/code/session_016dhxM43dnWvUu2B5Ph1iG1
1.2 KiB
1.2 KiB
L151 matched owner tunnel landing captures
Seed 0 camera poses resolved from the L151 owner layout and reused for both versions. Each view is at eye height at one of the three tunnel landing chambers. Before uses the L150 head build; after uses L151 source stamp 1ca3b84f6d35f7f355ec0f72dabd3b87a455ea02e5789fea611916962e5db8e5.
passage/0-1/0 / upper landing
passage/0-1/0 / lower landing
passage/1-2/0 / upper landing
passage/1-2/0 / lower landing
passage/2-3/0 / upper landing
passage/2-3/0 / lower landing
Capture quality failures: 0/12.