passages: tunnels own their floor - flat-bottomed tube + solid shell (L109, v217) - pending visual review
Owner design: flat world-horizontal floor (0.50 m corner blend), 0.75 m solid shell written only where the host field is air (interiors union first and beat every shell), 5 m cubic mouth ramps. Removed route support restoration, deferred support, support columns, mouth-support restoration and their capsule checks (-5,129 / +1,641 lines). Near-ready @W12: FI 1.39 -> 0.86, TN 1.29 -> 0.90, VS 0.85 -> 0.74, SW 0.70 -> 0.76 s (more shell/skirt surface). All walk audits pass; Clang/GCC W1/W8/W12 deterministic; fast tier PASS; Linux UE builds; 6 UE arrival traces pass. OPEN ISSUE: open-air shell (e.g. passage 0-1, 1037-1489 m route span) shows a regular stepped banding pattern - not merged into assembler/world until fixed/approved. Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com> Claude-Session: https://claude.ai/code/session_016dhxM43dnWvUu2B5Ph1iG1
This commit is contained in:
1 parent
95cf8de107
commit
5ea01988c4
104 files changed
+7880
-5022
No files matched your search
BIN
Binary file not shown.
|
After Width: | Height: | Size: 61 KiB |
Reference in new issue
Block a user