Fr0zka 451ebcb776 docs: close the operator stack -- handoff rewritten in plain language
Jahni built the last two commits and the game looks fine. Closing the thread.

OPSTACK-HANDOFF.md fully rewritten. The old one had become a private dialect --
"you've started using very unique terminology, i have NO idea what you've been
doing" -- which is a failure of the document, not the reader. The new version
leads with what the op stack was for, says plainly that Phase 3 was never built
and is not being built, carries the honest three-week ledger (120 commits, every
feat: a port, the world unchanged by design), and translates the jargon.

Final state: 8/8 archetypes live and bit-identical, 14/14 tests green through
871ca19, violations 0, and 39% of tiles skipped in the running game against 0%
that morning.

Flagged in the handoff: 4d33321 and 91585ea are built but not re-verified -- the
suite has not been re-run since. Two named checks, and revert 4d33321 if either
fails; the 39% does not depend on it.

Direction agreed: no Phase 3, no further refactoring, old switch stays as the
oracle, next work is visible content from fable-idea.md.

Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
2026-08-17 03:23:31 +02:00
S
Description
No description provided
6.6 MiB
Languages
C++ 97.6%
C 2.3%
C# 0.1%