5e875ae50441fcc5cad7a9f12885835e6bfdced5
Floor ribs are present in L109/L112/L113 rock tunnels too: the floor height comes from the nearest segment, so it jumps (up to 5.9-7.3 cm) where the nearest segment switches. v222 reduces them; faint ribs remain. Quiet-machine timing (load 0.64): near-ready 9-17% slower than L109 (FI W12 0.95 -> 1.10 s); candidate totals ~5x L109. Fast tier FAIL: 2 SW wall-shell probes of 31,381 read host air. Walk/grade audits pass; Clang/GCC deterministic; UE builds. Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com> Claude-Session: https://claude.ai/code/session_016dhxM43dnWvUu2B5Ph1iG1
Languages
C++
97.6%
C
2.3%
C#
0.1%