7661fe9d24e2af6e7c8d777bb70084d86ba7562b
Luna, round 5 goal 1 only (stopped by owner decision before the SurfaceWorld port): - Worm and Cascading passages now pass walkability; the wide floor stays clipped while the narrow route core stays open. - Hidden third failure found and fixed: long VerticalShafts diagonal legs were dropped from Core's spatial bins by a 100,000-bin safety cutoff (invisible to density queries); conservative bins restore them (18,570/18,570). - All 15 saved probes pass a walkability-only gate; build-time walkability gate added. NOT re-verified before the stop: W1/W8/W16 hashes, BuildHost UBT/actor run. Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com> Claude-Session: https://claude.ai/code/session_01MmSoF64BbRFmk9C3p1VsBJ
Languages
C++
97.6%
C
2.3%
C#
0.1%