Fr0zka b533294f5d docs(opstack): record the green build and rewrite the handoff for a fresh context
OPSTACK-PROGRESS gets the measured entry: every number the run produced, what each one settles, and
the single open warning. OPSTACK-PLAN's status header goes from UNVERIFIED to BUILT AND GREEN.

OPSTACK-HANDOFF is rewritten end to end. It no longer describes a transition in progress but a
completed one, and it leads with the two things a cold context needs: the Underwater 0%-coverage
warning (with the truncation-vs-floor finding behind it, and the reminder that a green bit-identity
over solid rock is not evidence), and the one task everything else now waits on -- making
FRoomGraphSource::EffectOverBox answer spatially.

It also carries forward the two debts that must be paid BEFORE that lands rather than after: box
bounds computed from strate params can be too optimistic once a per-room op raises them, and AUDIT
C2 is confirmed but unfixed on the switch path.

Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
2026-07-28 14:13:59 +02:00